| |
| Layfit Standard all 3
setup |
| |
|
- 3 layflat to a
3 valve
- Saw off ends to join on layflat hose using
the double barb
- Saw off next to the thread to screw on
a 3BSP valve
|
| |
|
| Layfit Elbow / Gauge setup |
 |
- 3 layflat to a
3 valve
- Cut end off one barb, cut next to thread on
other leg to screw on valve
- Drill through gauge hole (already threaded)
and screw in gauge
- One end remains sealed
|
| |
|